Why Does the Spare Parts Store Keep Growing? How to Set Critical Parts and Stock Limits

Author: Korgün Software Published: 20 November 2026 11-minute read
Why Does the Spare Parts Store Keep Growing? How to Set Critical Parts and Stock Limits

Share this article

What you will learn in this article

  • Why the spare parts store grows and which habits make it worse
  • The five measures for deciding whether a part is critical
  • How the critical, buffer and supply-on-call classes change the stocking decision
  • How to set the stock limit, supplier agreement and review period

In most manufacturing plants the spare parts store grows in the same way: a part bought in a hurry during a breakdown, a spare left on the shelf 'in case it is needed', parts for a machine that has since been replaced, and several boxes of the same item opened under different names in the records. The store looks full, yet the right part is still missing during a breakdown. This article explains step by step which parts to keep in stock and how to set the stock limit.

Short answer

The way to shrink the store is to stop applying one rule to every part

Start with machine criticality, the downtime impact of the part, the real lead time and emergency availability. Split the parts into three classes: critical, buffer and supply on call. Keep at least one spare for critical parts, set a consumption-based limit for buffer parts, and for supply-on-call parts hold no stock but agree a written lead time with the supplier.

Why does the spare parts store keep growing?

A growing store is usually a lack of decisions rather than an excess of stock. Different rules apply to the same part, nobody is clearly responsible for ordering, and every department prefers to stay on the safe side. The result is a 'let us keep one anyway' approach for cheap parts and the opposite caution for expensive ones.

Buying during a breakdown

When a machine stops, ordering the part is the fastest fix. But if the same failure does not recur, the part stays on the shelf. Every purchase made without separating an emergency need from a recurring need adds one more item to the store.

Several records for the same part

The same bearing can end up on several stock records through a supplier name, part code or spelling difference. With a separate minimum on each record, the total grows unseen and the same part turns up on two shelves during counting.

Parts left behind by replaced machines

When a machine is replaced, a line changes or a product family is discontinued, parts for the old model remain in the system. They do not appear in reports because they never move, yet they occupy space, shelf labels and counting time.

Records that no longer match the shelf

A part is purchased but not deducted from stock, or taken from the shelf without a consumption record. Once records and shelves diverge, the business buys unnecessarily and 'shows in stock but is not there' becomes routine.

Which spare part is critical? Five measures

Whether a part is critical is not about its price but about what happens when the machine stops. Assess the five measures below together rather than one by one; a part that looks weak on one measure may carry high risk on another.

Downtime impact

If the part is missing, does the machine stop completely, or can production continue on a backup line or by hand? A stop at the bottleneck machine hits delivery dates directly; the same stop on a line with spare capacity does not.

Real lead time

Measure the days between placing the order and the part arriving on the shelf. What counts is the time your supplier actually takes, not the catalogue figure; production queue, customs and transport are part of it.

Emergency availability

Can it be sourced the same day by courier, from a local supplier or through an approved substitute? If 'it can be found' depends on one person, it stops being true when that person is away. The supplier and the time must be written down.

Failure frequency and consumption

How many times has the part been replaced in the last two to three years? Keeping a part that never moves is usually habit rather than criticality. Maintenance and work order records are the most reliable source for this measure.

Substitution and compatibility risk

Does the part have an aftermarket equivalent, a calibration requirement, a software version or machine-maker approval? An incompatible substitute does not fix the failure; it creates a second stop and a quality risk.

A part is not automatically critical when all five measures look favourable. If an expensive drive is always stocked by the supplier and arrives in three days, an agreement may be better than keeping it on the shelf. Conversely, a cheap seal set on the bottleneck machine with a two-week lead time can be the most critical part in the plant.

Three classes: critical, buffer and supply on call

Classification standardises the decision, not the part. When parts in the same class follow the same rule, order quantities no longer change with the person or the day. What binds is not the class name but the level and review period written on the record.

Class

Critical

Parts whose failure stops production, with a long lead time and no easy emergency source. Keep at least one, preferably two, in stock and define minimum and maximum levels on the stock record. The maintenance supervisor owns the list and reviews it monthly.

Class

Buffer

Parts with a consumption history that do not fail every time, with a medium lead time. Hold one, or a limited minimum 1 / maximum 2, and compare against consumption every three months. If consumption rises, move the part into the critical class.

Class

Supply on call

Expensive parts that fail rarely or are always available at the supplier. They are not kept in stock; a written agreement covers lead time, price and priority. Without that agreement, this class means accepting the risk rather than deciding not to stock.

How do you build the critical parts list?

Before building the list you need three sets of data: the machine and line list, failure and maintenance records for the last two to three years, and purchase history with the suppliers' real delivery times. If failures are not recorded at all, the first list rests on interviews. Mark those assumptions and update the list from records three months later; otherwise it remains whatever the most vocal person remembers.

  1. 01Rank the machines by criticality

    Mark the bottleneck machines and those without spare capacity whose stop affects delivery dates directly. Tying up high stock for a non-critical machine does not solve the real risk; it only grows the store.

  2. 02Match the parts to the machines

    Use the maintenance card, the machine maker's parts list and past work orders. Merge records opened for the same part under different codes. The list is not reliable until one part, one record and one owner is the rule.

  3. 03Assess criticality against five measures

    Review each part by downtime impact, real lead time, emergency availability, consumption history and substitution risk. Maintenance, purchasing and the store should assess it together; one person's opinion turns the list into a personal habit.

  4. 04Write the class and the stock rule

    Mark the part as critical, buffer or supply on call, and write the minimum, maximum and review period for each class on the stock record. If the rule is not written down, order quantities are again set by habit.

  5. 05Assign an owner and a review date

    The maintenance supervisor owns the stock level, purchasing owns the lead time and the store owns record accuracy. Review the list at the intervals defined for each class rather than once a year.

How is the stock limit set?

A spare part stock limit is not set by consumption speed alone, as with raw materials. The decisive question is: if this part is missing, how many hours or days does production stop? For a critical part, the answer to 'how much downtime can we accept?' sets the upper limit.

A practical rule: add one unit of safety to the consumption expected during the lead time and compare the result with the repair time. If a part is used once every two years, the lead time is 10 days and the repair takes four hours, one spare in stock is enough. If the same part is always available at the supplier with a written lead time, strengthening that agreement costs less than keeping a second unit on the shelf.

The maximum level limits the cash tied up, not the shelf. For a critical part, a supply continuity agreement with a lower maximum is often cheaper than holding a high maximum. But if the agreement is not in writing, that assumption collapses on the first breakdown. The example list below is illustrative; recalculate it with your own machines, lead times and consumption records.

Bearing set

Machine: CNC 3

Class
Critical
Min – Max
1 – 2
Review
Monthly

Servo drive

Machine: CNC 3

Class
Critical
Min – Max
1
Review
Monthly

Conveyor belt (5 m)

Machine: Paketleme

Class
Buffer
Min – Max
1 – 2
Review
Every 3 months

Temperature sensor

Machine: Enjeksiyon 1-4

Class
Buffer
Min – Max
2 – 4
Review
Every 3 months

Mould heater cartridge

Machine: Enjeksiyon 2

Class
Buffer
Min – Max
2 – 4
Review
Every 3 months

Hydraulic pump

Machine: Pres 1

Class
Supply on call
Min – Max
0
Review
Every 6 months

Who owns the list, and when is it reviewed?

The spare parts list is not one department's job, but it must have one owner. Maintenance, purchasing and the store feed the same list from different angles. The review date belongs on a calendar rather than in someone's memory, so an overdue review comes up automatically.

Maintenance supervisor

Criticality assessment, stock level and consumption records. Critical parts are reviewed monthly, buffer parts every three months.

Purchasing officer

Real lead time, supplier agreements and alternative sources. Lead times are checked every six months and agreements at renewal.

Store officer

Shelf, label and record accuracy. Movements are checked monthly and the physical count per the annual plan; any variance is reviewed with maintenance and purchasing.

Six control items

Preparing the list once is not enough. The items below describe the minimum routine that keeps the store from growing again.

Critical machines and their parts are defined in a written list.
Every critical part has minimum and maximum levels on its stock record.
Duplicate stock records opened for the same part have been merged.
Supply-on-call parts have a written lead-time agreement.
Parts for machines no longer in use have been removed from the list.
The review period, owner and last check date are recorded.

Related guides

To prevent the same failure after maintenance, read our recurring failure after maintenance article; for recording downtime, see the unplanned downtime article; for general minimum and maximum levels, see the minimum and maximum stock level guide; to separate parts that are no longer used, read the dead stock article.

Businesses that want to track spare parts through a stock record, minimum level and movement history rather than a separate sheet can review the Korgün Cloud ERP inventory module. That page covers general inventory management; it does not replace maintenance planning or the machine maker's parts approval.

Frequently asked questions

What should the minimum stock level be for a spare part?

There is no single number. Critical parts usually need at least one spare, and consumption frequency plus lead time may justify more. For buffer parts, one unit or a limit such as minimum 1 / maximum 2 is often enough.

Should every spare part be kept in stock?

No. For expensive parts that rarely fail and are always available at the supplier, a written lead-time agreement can be better. But if 'it can always be found' is not backed by an agreement, that is accepting the risk rather than making a stocking decision.

How often should the critical parts list be updated?

Review critical parts monthly, buffer parts every three months and supplier agreements every six months. Update the list immediately when a machine is bought, a line changes or a product family is discontinued.

What if a part shows in stock but cannot be found during a breakdown?

First compare the record with the shelf: was the part deducted, is it in another location, does it sit on a duplicate record? Buying again before correcting the record means paying twice for the same part and growing the store further.