Export and Logistics
Shipment date, transport and document steps are tracked with the order.
Poletto Shoemaking tracks export orders together with production and logistics steps through Korgün ERP. Because the production stage of an order and its readiness for shipment are visible on the same screen, the foreign trade calendar runs more smoothly.
When an export order misses its date, the cost is not only the delay; transport and document processes are also replanned. Production and logistics therefore need to be seen on the same calendar.
Korgün ERP steps in use
At Poletto, when an export order is opened the product, quantity, destination country and shipment date sit in the same record. The production plan is built around that date, and completed quantities flow into the shipment list. During logistics preparation, stock and production status are checked together.
Shipment date, transport and document steps are tracked with the order.
Export due dates are compared with production capacity to build the plan.
Warehouse and production stock are visible on the same screen as the shipment plan.
Documents required before shipment are linked to the order.
Which work was set up, and in what order?
Country, quantity, shipment date and document information were moved to a shared record.
Ongoing export jobs were compared with current stock and loaded into the system.
Shipment dates were matched with production capacity to create the plan.
Quantity, stock and document checks became possible on one screen.
What changed in the process
Within the project scope, export, production and logistics at Poletto began to be tracked in one flow. The items below summarise the main changes.
Results may vary depending on the company’s working methods, data structure and project scope.
Common questions about the project
Export and logistics, production planning and stock synchronisation are handled in the same structure.
The shipment date depends on production completion. When the two processes are tracked separately, a delay is only noticed on the shipment day.
Required documents are linked to the order record and checked before shipment.
First the order and product structure is clarified; then production planning, stock and shipment are linked to the same record.
Continue with guides, products and resources related to this topic.
See how Hammer Jack tracks production, export and store stock in a central structure with Korgün ERP.
Success StoriesExplore how Bambi Shoes managed barcode product control, addressable warehouse and shipping processes with Korgün ERP and KG WMS.
Success StoriesSee how Flower Shoes tracks order, production and delivery steps in made-to-order manufacturing with Korgün ERP.