Footwear Manufacturing

Made-to-Order Production in a Single Flow at Flower Shoes

Flower Shoes tracks order, production and delivery steps for made-to-order footwear through Korgün ERP. Because the stage of each order is visible, planning and delivery preparation run more smoothly.

Published: 19.11.2026 Updated: 19.11.2026

The challenge

In made-to-order production each model follows a different flow. Order information therefore needs to be kept in the same place as production and delivery.

  • Confusion from manual tracking in made-to-order production
  • Model and quantity information reaching the production plan late
  • Delivery dates not being tracked together with the order
  • Loss of priority order during peak production

The solution

Korgün ERP steps in use

At Flower Shoes, when an order is received the model, quantity and delivery date sit in the same record. The production plan is built from that order, and completed steps flow into delivery preparation. This keeps the link between order, production and shipment intact.

Order Management

Model, quantity, colour and delivery date are collected in one order record.

Production Planning

Orders are transferred to the production plan by capacity and priority.

Delivery Tracking

Orders that complete production are linked to the delivery list.

Order Status Report

Open, in-production and ready-to-deliver orders are visible together.

Implementation steps

Which work was set up, and in what order?

  1. 1

    Standardising order fields

    Model, colour, size and delivery date fields were moved to a shared structure.

  2. 2

    Transferring open orders

    Ongoing jobs were loaded with priority and due-date information.

  3. 3

    Connecting the production plan

    Orders were split into production steps and shop-floor progress began to be tracked.

  4. 4

    Activating delivery preparation

    Completed orders were reflected in the delivery list.

Results achieved

What changed in the process

Within the project scope, order, production and delivery at Flower Shoes began to be tracked in one flow. The items below summarise the main changes.

  • The production stage of every order can be seen.
  • Model and quantity information is tracked together with the production plan.
  • Orders ready for delivery are easier to identify.
  • Priority order is managed more consistently during peak periods.

Results may vary depending on the company’s working methods, data structure and project scope.

Frequently asked questions

Common questions about the project

Which processes does Flower Shoes run from the same system?

Order management, production planning and delivery tracking are handled in the same flow.

How is priority order set in made-to-order production?

Delivery date, model and capacity information are assessed together and reflected in the production plan.

Why should delivery tracking sit with the order record?

Knowing the stage of the order provides accurate information for the date given to the customer and for shipment preparation.

How would a similar production structure be set up for us?

First the order fields and production steps are clarified; then planning and delivery are linked to the same record.

Did You Find This Page Useful?

Related content

Continue with guides, products and resources related to this topic.

Your privacy is important to us

We use cookies to improve your experience while visiting our site, provide our services, and fulfill our legal obligations. Click for more information.