Automotive & Engine Manufacturing

Production, Quality and Parts Tracking in One Flow

Fevzi Motor runs planning, quality control and stock steps in engine and spare-parts production through Korgün ERP. Having parts and product records in the same system makes decisions during production easier.

Published: 19.11.2026 Updated: 19.11.2026

The challenge

Engine production involves different parts, operations and quality checks within the same job. Scattered records slow this flow down.

  • Time lost in manual quality control processes
  • Gaps in spare-parts and component tracking
  • Difficulty reaching current data in production planning
  • Waiting on jobs that start before parts are ready

The solution

Korgün ERP steps in use

At Fevzi Motor, when a production job is opened, the required parts, operations and quality control points sit in the same record. Parts stock is compared with the production plan, and quality results are linked to the work order. Production, quality and the warehouse therefore work from the same information.

Production Planning

Engine and parts jobs are planned with capacity and due-date information.

Quality Control

Control points and results are recorded together with the work order.

Parts and Stock Tracking

Spare-parts and component balances are compared with production requirements.

Production Status Report

Open jobs, completed operations and quality status are tracked together.

Implementation steps

Which work was set up, and in what order?

  1. 1

    Organising engine and parts records

    Product, component and operation definitions were moved to a shared structure.

  2. 2

    Transferring open jobs and stock

    Ongoing production was compared with parts balances to prepare starting data.

  3. 3

    Linking quality control to work orders

    Control points and results were matched with production steps.

  4. 4

    Setting up parts readiness control

    Parts requirements before production became comparable with the plan.

Results achieved

What changed in the process

Within the project scope, production, quality and parts records at Fevzi Motor began to be tracked together. The items below summarise the main changes.

  • Quality control results are visible together with the production record.
  • Parts readiness can be compared with the production plan.
  • It is easier to track which job is at which operation.
  • Uncertainty caused by manual records is reduced.

Results may vary depending on the company’s working methods, data structure and project scope.

Frequently asked questions

Common questions about the project

Which processes does Fevzi Motor run from the same system?

Production planning, quality control, parts and stock tracking are handled in the same structure.

Why is parts tracking critical in engine production?

A missing part stops the production flow. Seeing parts balances together with the plan reduces waiting time.

How are quality control records linked to production?

Control points are matched with the related work order and operation, and results are kept in the same record.

How would a similar structure be set up in our production?

First the bill of materials and parts structure are clarified; then planning, quality and stock are linked to the same flow.

Did You Find This Page Useful?

Related content

Continue with guides, products and resources related to this topic.

Your privacy is important to us

We use cookies to improve your experience while visiting our site, provide our services, and fulfill our legal obligations. Click for more information.