Bill of Materials and Recipe
The parts and operations behind each product are defined in a single record.
Fanset tracks its high-variety assembly line in one flow with Korgün ERP. Because bill of materials, semi-finished goods and shipment records meet in the same system, production steps became more visible.
As product variety grows, it becomes harder to follow which part is reserved for which job on the assembly line.
Korgün ERP steps in use
At Fanset, production, bill of materials and stock run on the same data. Jobs released to the assembly line, parts consumed and semi-finished goods produced are tracked in the same record chain. This reduces the gap between the production plan and warehouse movements.
The parts and operations behind each product are defined in a single record.
Assembly jobs are planned with capacity and due-date information and released to the line in sequence.
Semi-finished output at the end of the line and part balances in the warehouse are visible on the same screen.
Order, production status and shipment list are checked together to complete preparation.
Which work was set up, and in what order?
Bills of materials, assembly operations and part codes were moved into a shared structure.
Ongoing assembly jobs were compared with warehouse balances to create starting data.
Each assembly job was linked to the parts consumed and the quantity completed.
Order, production and shipment records became controllable in the same flow.
What changed in the process
After implementation, production steps at Fanset became traceable from a single screen. The items below summarise the main changes observed within the project scope.
Results may vary depending on the company’s working methods, data structure and project scope.
Common questions about the project
Production planning, bill of materials, semi-finished goods and stock tracking, and shipment preparation are used within the same structure.
Knowing which stage semi-finished goods have reached makes it easier to sequence the next assembly step and the shipment plan.
Because the affected product and work order can be traced, the planning team can manage the transition in a controlled way.
First the bill of materials and stock structure are reviewed; then assembly flow, work orders and shipment steps are handled together.
Continue with guides, products and resources related to this topic.
Learn with an example how to track the material sent to the subcontractor, partially returned semi-finished product, wastage and open balance under the same work order.
Blog PostThe most common cost crisis in companies that do not use production planning (MRP): no raw material for urgent orders while the warehouse is filled with semi‑finished goods that will not be used for months. In this article we examine how keeping the production line continuously busy affects cash flow and opportunity costs.
Blog PostWhat is a bill of materials and how is it prepared? Examine the relationship between raw materials, semi-finished products, variants, wastage and product costs through a sample bill of materials.