Production and materials planning guide

How to Plan Materials by Model

Model-based material planning reviews product models and quantities from different orders in a shared period view. Model requirements are considered alongside valid product structures, inventory, reservations and open supply to clarify which materials are needed for which orders and periods.

Planning flow from model to material readiness

  1. Order and planned quantity
  2. Model and valid product data
  3. Total requirement by period and material
  4. Stock, reservation and open-supply review

Steps for model material planning

  1. 1

    Define the planning scope

    Choose which orders, model groups and production periods will be reviewed together. Separate confirmed orders, production requests and their dates so the demand basis remains clear.

  2. 2

    Match model and variant records

    Check that order lines match the correct model, item code and, where applicable, colour, size or measurement variants. Duplicate records for the same model under different codes can split or misgroup requirements.

  3. 3

    Relate model demand to material records

    Verify that the bill of material or production recipe used for each model is the valid version. Variant-specific differences should already be represented in the company’s product structure; the purpose here is to confirm the plan uses the right model data, not to redefine that structure.

  4. 4

    Aggregate requirements by period and material

    Bring model quantities from orders together with their material data in the relevant planning periods. Review total demand for shared materials across models while retaining model, order and due-date detail for traceability.

  5. 5

    Consider stock, reservations and open supply

    Check available warehouse quantities, reserved stock, expected output from production in progress and open purchase deliveries. Assess whether material will be available by the planned requirement date; a total stock figure alone is not enough.

  6. 6

    Review gaps with owners and update the plan

    Compare model-material periods showing shortages or excesses with source orders and records. Reassess after correcting quantities, dates, model codes or stock information, and confirm decisions with production and materials-planning owners.

Example of grouping orders by model

Example: two customer orders require 60 and 40 units of the same model in the same planning period. The plan can show a total of 100 units for the model while retaining customer order and due-date detail. Material requirements derived from model data can be grouped for shared item codes; lines that differ by variant or due date remain separate. Finally, stock, reservations and open supply are checked against each requirement date.

Order 1

60

Order 2

40

Period total · same model

100

Check when reviewing the plan

  • Are order lines matched to the correct model and item codes?
  • Are requirements grouped correctly by period and material?
  • Are variant or due-date differences preserved where needed?
  • Are product data validity and units correct?
  • Are inventory reservations and open supply assigned to the right dates?
  • Can the orders behind each total requirement be traced?

Frequently asked questions

What does model-based material planning provide?

It helps review model quantities from multiple orders and their material requirements together by period. Total demand for shared materials becomes visible while retaining the order or model that created each requirement.

When should model requirements be consolidated?

A consolidated view is useful when orders use the same material and compatible production or delivery periods. Preserve detail where variants, quality requirements, warehouses, lots or due dates differ; do not merge incompatible requirements into one total.

How should colour and size be handled in planning?

Determine whether the product or material changes by variant. If material demand differs by variant, track the corresponding codes and quantities separately; if the material is shared, requirements can be aggregated in the correct unit and period.

How does model planning relate to MRP?

The model-level view helps identify which products, models and order groups create demand. An MRP run evaluates that demand against bills of material, inventory and open supply to produce the material plan. Item codes, periods and quantities should be consistent across both views.

When using model totals, retain order, variant and due-date detail. Well-grouped requirements support shared material preparation, while traceable source records help investigate planning differences.

Did You Find This Page Useful?

Related content